Bespoke Wardrobes · Built In

Wardrobes fitted to your room.

From two-door freestanding to wall-to-wall walk-in. Solid teak frames, premium veneer or hand-painted doors, soft-close mechanisms, integrated lighting. Designed and built to your exact wall.

Chapter II — Featured Wardrobes

Selected wardrobes.

Full Catalog →

Each piece is made to order — these are recent examples. Customise dimensions, finish, and upholstery to suit your space.

View Details →
Nila
4-door · Custom finishes
Wardrobe
View Details →
Adira
King · Upholstered headboard
Bed
Chapter III — Customisation

Configured to what you own.

Wardrobes fail when they ignore reality — your saree count, your shoe collection, your husband's suits. We design around what's actually in your life, not a template.

I.

Layout

Hanging zones (long and short), shelving, drawers (deep and shallow), shoe pull-outs, jewellery trays, ironing nooks, laundry hampers. Send us a photo of your current setup — we'll design the upgrade.

II.

Doors & Finish

Hinged, sliding, or pivoting. Solid wood, premium veneer (teak, walnut, oak), high-gloss lacquer, hand-painted, or fluted glass. Brass, leather, or hidden touch handles.

III.

Hardware

Blum or Hettich soft-close hinges and runners. LED strip lighting in hanging sections, motion-activated. Lockable drawers and concealed safes available on request.

Chapter IV — The Process

From wall to walk-in.

Site survey, design, build, install. Most projects six to eight weeks from confirmed brief.

I.
Site Survey

We measure on-site (metros) or via your detailed photos + dimensions. Walls are rarely perfectly square — we account for the reality, not the assumption.

II.
Design Drawings

Detailed elevations, cross-sections, and 3D renders. You'll see exactly what fits where, before we cut anything.

III.
Workshop Build

Carcasses built modular for transport. Doors, drawers, and internal fittings made and finished. Pre-assembled in workshop for quality verification.

IV.
On-Site Install

Two to three days on-site for a typical 3-metre wardrobe. Cleaned and finished before we leave. Six-month settling check included.

Chapter V — Questions

Questions, answered.

Six to eight weeks from confirmed design. Site survey week one, design sign-off week two, build weeks three to seven, install week eight. Larger walk-ins may take ten weeks.

Yes. We've built into sloped ceilings, around structural columns, into bay windows, and under stairs. Send photos and rough measurements on WhatsApp and we'll show how it could work.

All structural members are kiln-dried, anti-termite treated, and sealed before assembly. Doors and panels use marine-grade plywood substrate with premium veneer or solid wood faces. We guarantee against termite damage for ten years.

Yes — this is increasingly our most-requested project. Full walk-in design including island drawers, full-length mirrors, integrated seating, lighting, and ventilation. Send your room dimensions to start.

Absolutely. We work directly with designers and architects through our Trade Program — see the trade page for designer pricing and project terms.

For The Trade

Specifying for a project?

Designers, architects, and procurement teams: get direct project pricing, custom dimensions, and dedicated project management. Lead times 4–6 weeks. Pan-India delivery.

Apply to Trade Program
Jekoya

Let us help shape your space.

We respond on WhatsApp within fifteen minutes during business hours. Share what you are working on — a single piece, a complete home, or a full project.

Message on WhatsApp

or write to us at sales@jekoyafurniture.com

Chat with us